Lessons From Failed Robot Projects

Published: Published on Zhilianhai

The recurring causes

  • Part presentation was less stable than the demo assumed.
  • Cycle time was promised without counting handshakes and settling.
  • Nobody owned the cell after commissioning.
  • The scope grew without a change log, and the original payback disappeared.
  • Safety was assessed after the layout was frozen.
Warning signWhat to do at the next gate
"We will fix it on site"Insist on factory acceptance with real parts
No named operatorStop and assign ownership before delivery
Cycle figures without basisDemand the calculation and the assumptions
Changes discussed verballyConvert to written change requests

A failed project is rarely a bad robot. It is almost always an unmanaged assumption.

Information is provided for initial research. Verify specifications, pricing, policies and standards against the original source before making decisions.

BackSection

Company information

Browse public company records in the company directory. To submit or correct company information, contact our team. Public inclusion does not imply supplier certification.

SectionLatestResources