Record Deviations Between a Robot Mounting Drawing and the Site
When installation drawings and site conditions disagree, record and assess the deviation before the responsible design and equipment teams decide what to do.
Cover image: AI-generated conceptual illustration, not a photograph of an actual product or project.
Locate the deviation
Identify the drawing revision, location, observed dimension or connection, and discovery date. Photos should locate the issue, but dimensions not visible in a photo are not verified.
Define the affected scope
Consider foundation strength, robot movement, cables, guarding and maintenance access, and list potentially affected drawings.

Obtain responsible review
The design team, supplier and site owner should assess acceptance and remedial action within their responsibilities. Follow site procedures to control equipment where hazards are involved.
Verify before closing
After correction, check dimensions, equipment state and acceptance evidence. Update as-built drawings or deviation records so maintenance does not rely on an obsolete revision.
Applying the checklist: a hypothetical example
If support holes differ from the latest drawing, record the observed location and drawing revision, then have design and equipment owners assess the impact and document the approved correction or deviation. Photos help locate the issue but do not replace required measurements.
Sources and application limits
This guide refers to Universal Robots: deployment considerations. Examples and review steps are editorial guidance; use the documentation for the actual device and qualified assessment.