Skip to main content
Section

Mothballing a Robot Cell and Restarting It

Published: Published on Zhilianhai

Before shutdown

ItemAction
IsolationLock off and tag the supply to prevent accidental energising
MoistureDesiccant in the cabinet, or periodic power-up to drive out damp
ProtectionRust preventative on guideways and covers over the machine
RecordsNote the shutdown date and the stored condition

Restart sequence

  • Check the environment and the cabinet for moisture or foreign objects.
  • Jog each axis at low speed and listen for unusual noise or binding.
  • Verify zero positions and safety functions before automatic operation.
  • Increase inspection of the first production batch to confirm accuracy.

After a long shutdown, a full inspection by the manufacturer or an integrator is advisable.

Information is provided for initial research. Verify specifications, pricing, policies and standards against the original source before making decisions.

BackSection

Company information

Browse public company records in the company directory. To submit or correct company information, contact our team. Public inclusion does not imply supplier certification.

SectionLatestResources