Coordinating Design Reviews Across Partners

Published: Published on Zhilianhai

How to run joint reviews

StagePurpose
Concept reviewAgree the architecture and interfaces
Detailed reviewCheck drawings, tolerances and signals against the interface list
Pre-build reviewConfirm readiness before manufacturing
Pre-delivery reviewVerify documents, spares and training

Practical measures

  • One shared agenda and one set of minutes.
  • Every action with an owner and a date.
  • Re-verify interfaces after any change.

Interface registers should be signed by both partners before manufacturing starts.