Robot Installation Basics

Published: Published on Zhilianhai

What has to be ready

ItemRequirement
FoundationLevel, load capacity and fixing method
PowerCapacity, protection and isolation point
AirPressure, flow and quality
EnvironmentTemperature, dust and humidity within specification
AccessDelivery route, lifting equipment and floor protection

During installation

  • Keep the site tidy; installation teams work faster in clean areas.
  • Record deviations from the plan as they happen.
  • Do not energise until the electrical checks are complete.

Site preparation requirements come from the equipment documentation and the integrator plan.

Information is provided for initial research. Verify specifications, pricing, policies and standards against the original source before making decisions.

BackSection

Company information

Browse public company records in the company directory. To submit or correct company information, contact our team. Public inclusion does not imply supplier certification.

SectionLatestResources